|
|
|
|
|
|
James West and Partners, Peterhead have ordered this vessel as a repeat
of "Fruitful Vine" BF 240 with the main engine being a Mitsubishi S6R2 MPTK. The hull is currently under
construction in Macduff
|
MACHINERY Mitsubishi S6R2 MPTK main engine.
|
| |
|
|
|
|
|
|
|
|
The hull of this vessel will be a repeat of the yard No's 642/646/647, and construction is underway
in Macduff, to the order of W.McLeman, Peterhead
|
MACHINERY Cummins KTA19M3 main engine.
|
| |
|
|
|
|
|
|
|
|
The hull of this Macduff Ship Design model, built earlier in Portugal, is now lying
in Macduff ready for fitting out. More details later.
|
|
| |
|
|
|
|
|
|
|
|
This vessel is under construction in Macduff to the order of Aberdeen Harbour Board.
Designed by Macduff Ship Design Ltd to carry out various duties including rubbish collection, plough dredging, surveying,
dive support, lifting, harbour repairs and occasional pilot duties.
|
MACHINERY Twin Scania DI12 main engines.
|
| |
|
|